Eleanor Reservoir Dam Valve Repair Project

Summary

SCH Number
2012098272
Public Agency
Regional Water Quality Control Board, Region 5 (Central Valley), Sacramento
Document Title
Eleanor Reservoir Dam Valve Repair Project
Document Type
NOE - Notice of Exemption
Received
Posted
9/25/2012
Document Description
The Project consists of repairing two 24-inch valves on Eleanor Reservoir Dam. In order to perform the repair work, three new 36-inch culverts will be permanently installed at an existing coffer dam within Eleanor Reservoir and a 20-foot breached section of the existing coffer dam will be permanently filled with 120 cubic yards of rock/gravel. The reservoir will be lowered at Eleanor Dam for the repair work.

Contact Information

Name
Skyler Anderson
Agency Name
Regional Water Quality Control Board, Region 5 (Central Valley),
Contact Types
Lead/Public Agency

Location

Counties
Tuolumne

Notice of Exemption

Exempt Status
Categorical Exemption
Type, Section or Code
S:15301,15302
Reasons for Exemption
Existing Facilities. Minor Alteration to Land.

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print