Evergreen Road at South Fork Cottonwood Creek Bridge Replacement Project

6 Documents in Project

Summary

SCH Number
2012092044
Lead Agency
Tehama County
Document Title
Evergreen Road at South Fork Cottonwood Creek Bridge Replacement Project
Document Type
NOD - Notice of Determination
Received
Posted
2/4/2022
Document Description
The purpose of the project is to replace the functionally obsolete South Fork Cottonwood Creek Bridge (08C-0008). The project is needed to address the bridge’s structural deficiencies that include seismic instability, insufficient width, capacity, and inadequate curves near the bridge while minimizing the impacts on the floodplain, local property owners, and wetland areas. Road and intersection improvements are needed to meet current geometric standards and accommodate future traffic demands.

Contact Information

Name
Lynn Coster
Agency Name
Central Valley Regional Water Quality Control Board
Job Title
Senior Environmental Scientist
Contact Types
Responsible Agency

Location

Counties
Tehama
Parcel #
004-060-032, 004-330-055
Township
29N
Range
4W
Section
17, 20
Base
MDB&M

Notice of Determination

Approving Agency
Central Valley Regional Water Quality Control Board
Approving Agency Role
Responsible Agency
Approved On
County Clerk
Tehama
Final Environmental Document Available at
The Initial Study/Mitigated Negative Declaration is available to the general public at: Tehama County’s Website: http://www.co.tehama.ca.us/; at the Tehama County office located at 9380 San Benito Avenue, Gerber, CA 96035; and at the Tehama County Library, Corning Branch at 740 3rd Street, Corning, CA 96021.

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Notice of Determination

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print