Lower Feather River Gravel Supplementation and Improvement Project (A102)

4 Documents in Project

Summary

SCH Number
2012092036
Lead Agency
California Department of Water Resources (DWR)
Document Title
Lower Feather River Gravel Supplementation and Improvement Project (A102)
Document Type
NOD - Notice of Determination
Received
Posted
12/18/2013
Present Land Use
State land adjacent to the Feather River Fish Hatchery
Document Description
The proposed project is located in adjacent to the Feather River in the city of Oroville, Butte County, California. It is located downstream of Oroville Dam near the Feather River Hatchery between River Mile 66 and 67, and is less than 0.25 mile downstream of the Feather River Fish Barrier Dam. The proposed project would improve five spawning sites within the project area. Improvements to spawning sites would require active restoration in the stream channel to modify the channel hydraulics through changes in channel elevations, gravel augmentation, and loosening of armored surface layers. Addendum to IS/MND prepared December 2013.

Contact Information

Name
Gail Kuenster
Agency Name
California Department of Water Resources
Contact Types
Lead/Public Agency

Location

Cities
Oroville
Counties
Butte
Cross Streets
Montgomery Street and Washington Avenue (project is approx 0.6 mile downstream)
Zip
95966
Total Acres
38.50
State Highways
Hwy 70, 162
Railways
Union Pacific Railroad
Schools
Hearthstone, Plumas Ave
Waterways
Thermalito Div. Pool/Feather River/Thermalito Forebay
Township
19N
Range
04E
Section
7 & 8
Base
MDBM

Notice of Determination

Approving Agency
California Department of Water Resources
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print