Installation of Gravure Press and RTO by G3 Enterprises (Project N-1121433)

2 Documents in Project

Summary

SCH Number
2012092034
Lead Agency
San Joaquin Valley Air Pollution Control District
Document Title
Installation of Gravure Press and RTO by G3 Enterprises (Project N-1121433)
Document Type
NOD - Notice of Determination
Received
Posted
11/13/2012
Present Land Use
General Industrial
Document Description
G3 Enterprise (Applicant) is proposing to install a 6-color gravure type printing press, a 2.5 MMBtU/hr natural gas fired ink drying oven, a 5 MMBtu/hr regenerative thermal oxidizer (RTO), and ink dispensing room as part of the printing operations at the existing Modesto facility located in Ceres, Stanislaus County, California. The equipment is being relocated from a facility located in Ukiah, Mendocino County to the Modesto facility. The Ukiah facility which is located outside of the San Joaquin Valley Air Basin is owned by the Applicant and will be permanently closed at the time the equipment is removed. The printing operation will take place within and adjacent to an existing building and will be manned and maintenance by existing on-site employees. The project will allow G3 Enterprises to process labels on-site concurrent with packaging operations.

Contact Information

Name
Jessica Willis
Agency Name
San Joaquin Valley Air Pollution Control District
Contact Types
Lead/Public Agency

Location

Cities
Ceres, Modesto
Counties
Stanislaus
Cross Streets
Crows Landing Road & Whitmore Avenue
Zip
95358
Parcel #
086-015-029
State Highways
SR 99
Railways
UPRR
Schools
Sinclear Elementary
Township
4S
Range
9E
Section
16
Base
MDB&M

Notice of Determination

Approving Agency
San Joaquin Valley Unified Air Pollution Control District
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print