Butte Creek Restoration Project

5 Documents in Project

Summary

SCH Number
2012092018
Lead Agency
Pit Resource Conservation District
Document Title
Butte Creek Restoration Project
Document Type
NOD - Notice of Determination
Received
Posted
3/7/2013
Present Land Use
Exclusive Agriculture
Document Description
The Pit Resource Conservation District is requesting $294,817 in funding from the Sierra Nevada Conservancy's Proposition 84 Preservation of Ranches and Agricultural Lands Grant Program for wetland restoration along Butte Creek in Big Valley. This project would utilize plug and pond techniques along 1.5 miles of creek channel. The project includes excavating sod and topsoil for re-vegetation, excavating and transporting fill material to the entrenched stream channels, constructing a grade control structure, filling a ditch and replanting salvaged vegetation and replacing topsoil. Construction methods include the operation of dirt moving machinery (e.g. excavator, loader, scraper) to remove or add soil to create benches, reconstruct channels, fill enlarged channels, create ponds, and remove dirt from higher elevation areas. The project site is currently hayed and grazed. The project would protect the productive half of the meadow and convert the non-productive lower half to something similar to the upper area.

Contact Information

Name
Jim Branham
Agency Name
Pit Resource Conservation District
Contact Types
Lead/Public Agency

Location

Counties
Lassen
Cross Streets
Hwy 139 x Butte Crk Rd
Total Acres
100
Parcel #
003-20-05, 003-080-12
State Highways
Hwy 139
Railways
No
Airports
Adin
Schools
Modoc Preschool
Waterways
Butte Creek tributary to Ash Creek
Township
38N
Range
9E
Section
10, 14
Base
MDB&M
Other Location Info
Adin
Other Information
Section Cont.: 15

Notice of Determination

Approving Agency
Sierra Nevada Conservancy
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print