Eldorado National Forest Barrett Lake 4WD Trail Bridge Development

2 Documents in Project

Summary

SCH Number
2012092017
Lead Agency
California Department of Parks and Recreation
Document Title
Eldorado National Forest Barrett Lake 4WD Trail Bridge Development
Document Type
NOD - Notice of Determination
Received
Posted
10/30/2012
Present Land Use
National Forest Lands
Document Description
CDPR has awarded state funds to the Eldorado National Forest for the construction of a bridge on the Barrett Lake 4WD Trail and the reroute of the existing trail to connect with the new bridge. A 45 to 50' wood and steel bridge would be built to span the Jones Fork of Silver Creek, replacing the current wet creek crossing (where vehicles drive through the creek). ~0.5 miles of new trail would be constructed to connect the bridge with the existing trail alignment. Most of the new trail and the bridge would be located on granite outcroppings to minimize vegetation disturbance. The project purpose is to reduce sediment delivery to the creek while still providing for a high quality motorized trail experience. The project would also restore 0.4 mile of trail to be abandoned and create a 2-3 car parking area in a disturbed area south of the creek.

Contact Information

Name
George MacDougall
Agency Name
California Department of Parks and Recreation
Contact Types
Lead/Public Agency

Location

Counties
El Dorado
Cross Streets
Highway 50 and Wright's Lake Road (site is approx. ten miles from intersection on WLRd)
Zip
95726
Total Acres
1
Parcel #
various
State Highways
No
Railways
No
Airports
No
Schools
No
Waterways
Jones Fork of Silver Creek
Township
11N
Range
16E
Section
20/29
Other Location Info
City/Nearest Community: Kyburz

Notice of Determination

Approving Agency
CA Parks & Rec., OHMVR Division
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print