Upper Feeder Santa Ana River Expansion Join Replacement Project (Lake or Streambed Alteration Agreement No. 1600-2016-0234-R6)
4 Documents in Project
Summary
SCH Number
2012091055
Lead Agency
Metropolitan Water District of Southern California
Document Title
Upper Feeder Santa Ana River Expansion Join Replacement Project (Lake or Streambed Alteration Agreement No. 1600-2016-0234-R6)
Document Type
NOD - Notice of Determination
Received
Posted
6/14/2017
Present Land Use
Open Space-Water
Document Description
CDFW has executed Lake and Streambed Alteration Agreement No. 1600-2016-0234-R6, pursuant to section 1602 of the Fish and Game Code to the project applicant, The Metropolitan Water District of Southern CA.
Project consists of replacing the existing expansion joint with a bellows joint at the Santa Ana River Bridge Crossing of the Upper Feeder pipeline. Construction activities include vegetation removal of mature southern willow/cottonwood woodland (0.09 acres) and grading of the 40 x 100-foot work area, set-up of heavy construction equipment, scheduled dewatering discharges of 40 acre feet (13 million gallons) at flow rates of 4-6 cubic feet per second form two pipeline locations along the Santa Ana River, replacement of the existing expansion join, inspection of the new bellows joint, and clean-up of the construction site.
Contact Information
Name
Kimberly Freeburn-Marquez
Agency Name
CDFW Inland Deserts Region
Contact Types
Lead/Public Agency
Phone
Location
Coordinates
Cities
Riverside
Counties
Riverside
Cross Streets
near the intersection Wilderness and Jurupa Avenue, east of Van Buren Avenue
Zip
92509
Total Acres
1.43
Parcel #
1400-29-11, 15, 25, 5, 21
State Highways
Hwy 91, I-60
Railways
UPRR
Airports
Riverside Municipal, Flabob
Schools
Indian Hill, Pedley, Stone
Waterways
Santa Ana River
Township
2S
Range
5W
Section
30
Notice of Determination
Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.