Recycled Water Phase III Pipeline Expansion Segment 5
8 Documents in Project
Summary
SCH Number
2012091049
Lead Agency
City of Carlsbad
Document Title
Recycled Water Phase III Pipeline Expansion Segment 5
Document Type
NOD - Notice of Determination
Received
Posted
8/20/2018
Document Description
Two extensions would be addedto the Segment 5 pipelines; one extension wuld extend the pipeline northeast on tamarack Ave' the other extension would branch off the Marron Road pipeline north on Monroe Street. An extension to the Segment 7 pipeline would be added on Tamarack Ave that would connect a gap in the previously proposed Segment 7 pipelines. New potable water pipelines, ranging in size from 6-inches to 8-inch in diameter, would be installed in the Carlsbad Palisades and Flower Fields neighborhood hereafter referred to as Palisades potable water pipelines, which would be abandoned in place.
The 1.5 million gallon storage tank is proposed to be located on the vacant, pre-graded pad southeast of the existing 8.5 MG storage tank on the D tank site, near Black rail Road. The tank would be connected to the existing pipeline adjacent to the site. This location is approximately 150 feet east of the previously proposed tank location. The proposed storage tank would have security lighting.
Contact Information
Name
Pam Drew
Agency Name
City of Carlsbad
Contact Types
Lead/Public Agency
Phone
Location
Coordinates
Cities
Carlsbad
Counties
San Diego
Cross Streets
mult
Zip
92008
Parcel #
N/A
State Highways
I-5
Railways
LOSSAN
Airports
Palomar Airport
Schools
Carlsbad Unified District
Waterways
Buena Vista Creek
Notice of Determination
Approving Agency
City of Carlsbad
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.