Addendum to the Carlsbad Municipal Water District Phase lll Recycled Water Project

8 Documents in Project

Summary

SCH Number
2012091049
Lead Agency
City of Carlsbad
Document Title
Addendum to the Carlsbad Municipal Water District Phase lll Recycled Water Project
Document Type
ADM - Addendum
Received
Document Description
The CMWD is currently proposing modifications to the approved project, which is the subject of this addendum. The proposed modifications include: two extensions would be added to the segment 5 pipelines; one extension would extend the pipeline northeast on Tamarack Ave; the other extension would branch off the Marron Rd pipeline north on Monroe St. An extension to the segment 7 pipeline would be added on Tamarack Ave that would connect a gap in the previously proposed segment 7 pipelines. New potable water pipelines, ranging in size from 6 in to 8 in in diameter, would be installed in the Carlsbad Palisades and Flower Fields neighborhoods. The 1.5 MG storage tank is proposed to be located on the vacant, pre-graded pad southeast of the exisitng 8.5 MG storage tank on the D Tank site, near Black Rail Rd.

Contact Information

Name
Lindsay Leahy
Agency Name
City of Carlsbad
Contact Types
Lead/Public Agency

Location

Cities
Carlsbad
Counties
San Diego
Cross Streets
mult
Zip
92008
Parcel #
N/A
State Highways
I-5
Railways
LOSSAN
Airports
Palomar Airport
Schools
Carlsbad Unified District
Waterways
Buena Vista Creek

Notice of Completion

State Review Period Start
State Review Period End
State Reviewing Agencies
California Department of Fish and Wildlife, South Coast Region 5 (CDFW), California Department of Parks and Recreation, California Department of Transportation, District 11 (DOT), California Highway Patrol, California Native American Heritage Commission (NAHC), California Public Utilities Commission (CPUC), California Regional Water Quality Control Board, San Diego Region 9 (RWQCB), Caltrans, Division of Aeronautics, Department of Water Resources, Resources Agency, State Water Resources Control Board, Division of Drinking Water, State Water Resources Control Board, Division of Drinking Water, District 14, State Water Resources Control Board, Division of Water Rights, State Water Resources Control Board, Divison of Financial Assistance
Development Types
Water Facilities (Type pipelines)
Project Issues
Aesthetics, Agriculture and Forestry Resources, Air Quality, Biological Resources, Coastal Zone, Cultural Resources, Cumulative Effects, Drainage/Absorption, Flood Plain/Flooding, Geology/Soils, Hazards & Hazardous Materials, Hydrology/Water Quality, Land Use/Planning, Mineral Resources, Noise, Population/Housing, Public Services, Recreation, Schools/Universities, Solid Waste, Transportation, Vegetation, Wetland/Riparian, GHG

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print