Folsom Women's Facility
2 Documents in Project
Summary
SCH Number
2012082107
Lead Agency
California Department of Corrections and Rehabilitation
(CDCR)
Document Title
Folsom Women's Facility
Document Type
NOD - Notice of Determination
Received
Posted
11/15/2012
Present Land Use
Prison / Open Space and Conservation District / Public
Document Description
The proposed project consists of reactivation and reuse of the former Folsom Transitional Treatment Facility (FTTF) at Folsom State Prison (FSP) as a newly designated FWF with the capacity to house 403 female offenders. The former FTTF, which operated until recently, housed 400 male inmates, and the existing facility would require minimal modification for the conversion to the proposed FWF. The project would include renovating an existing modular support building for use as a primary care clinic; renovating a room in the existing central support building for a increased pharmacy; installing razor wire on the existing perimeter fence; pruning trees; replacing the existing sewage grinder pump (located below ground); and restriping the existing 60-space parking lot for 68 parking spaces. Other improvements would include cleaning the lenses and replacing old lamps in standard pole-mounted lights and adding a total of five wall-mounted, low-cast light fixtures on the exterior of existing facility buildings. A maximum of 100 new staff would operate the FWF, which would operate as a satellite facility to FSP.
Contact Information
Name
Deborah Hysen
Agency Name
California Department of Corrections and Rehabilitation
Contact Types
Lead/Public Agency
Phone
Location
Coordinates
Cities
Folsom
Counties
Sacramento
Cross Streets
Folsom Prison Road and East Natoma Street
Zip
95671
Total Acres
7
Parcel #
071-0010-021-0000
Railways
UPRR
Schools
Blanche Sprentz; Carl
Waterways
American River; Folsom Lake, Lake Natoma
Township
10N
Range
8E
Section
30
Notice of Determination
Approving Agency
CA Dept. of Corrections and Rehabilitation
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.