Grass Valley Field Office Replacement

3 Documents in Project

Summary

SCH Number
2012082105
Lead Agency
Motor Vehicles, Department of (Department of Motor Vehicles)
Document Title
Grass Valley Field Office Replacement
Document Type
NOD - Notice of Determination
Received
Posted
10/23/2012
Present Land Use
OP/Office Professional/Public

Document Description
The proposed project consists of the design and construction of a new one-story, approximately 7,600 gsf DMV field office on approximately 1.42 acres. The field office would include counter and drive test services for the public. Multi-phased construction would allow the existing field office to remain operational until employees move into the new office. Phased work includes re-routing utilities, temporary utilities for construction trailers and temporary parking. The project includes the demolition of multiple buildings totaling approximately 7,110 gsf. Proposed site improvements include approximately 50 parking spaces, a motorcycle drive test area, new paving, utilities, curbs, landscaping, a trash enclosure, and site lighting. Construction may require the relocation of on-site groundwater monitoring wells.

Contact Information
Brian Wilkinson
Department of Motor Vehicles
C/O DGS PO Box 989052 (MS509)
West Sacramento, CA 95798-9052

Phone : (916) 376-1605

Location

Coordinates
39°14'9"N 121°3'53"W
Cities
Grass Valley
Counties
Nevada
Cross Streets
Sutton Way, Brunswick Road
Zip
95945
Total Acres
1.42
Parcel #
35-400-18-000
State Highways
SR 49/20
Airports
Nevada County Air Park
Township
16N
Range
8E
Section
24
Base
MDB&M

Notice of Determination

Approving Agency
California Department of Motor Vehicles
Approving Agency Role
Lead Agency
Final EIR Available Location
Department of General Services, Real Estate Services Division, PSB/Environmental Services, 707 Third Street, 3rd Floor, MS 509, West Sacramento, CA 95605

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A Statement of Overriding Considerations was adopted for this project
No
(5) Findings were made pursuant to the provisions of CEQA
N/A
Download CSV New Search