Alan Murray - Coastal Grading Permit - GP2012-10C
2 Documents in Project
Download CSV
New Search
Print
Summary
- SCH Number
- 2012082091
- Lead Agency
- Del Norte County
- Document Title
- Alan Murray - Coastal Grading Permit - GP2012-10C
- Document Type
- NOD - Notice of Determination
- Received
- Posted
- 11/21/2013
- Present Land Use
- Z: Rural Res 3-acre min. and Ag General 5 acre min. GP: Rural Res. 1 du per 3 acres. & General Ag. 5-acre min
- Document Description
- A Coastal Grading Permit Application has been filed to implement a Restoration Plan as a result of an existing grading violation. The grading violation was the result of grading, mowing, cutting, and removing vegetation within a riparian and wetland habitat. The project is located on a parcel near the southeast corner of the north intersection of Ocean View Drive and U.S. Highway 101 in Smith River.
- Contact Information
-
Rosanna Bower
Del Norte County Engineering Division
Lead/Public Agency
981 H Street, Suite 110
Crescent City, CA 95531
Phone : (707) 464-7229
Location
- Coordinates
- 41°59'22"N 12°12'24"W
- Counties
- Del Norte
- Cross Streets
- Ocean View Drive and Hwy 101 N.
- Zip
- 95567
- Total Acres
- 10
- Parcel #
- 101-070-08
- State Highways
- Hwy 101
- Waterways
- Winchuck River, Pacific Ocean
- Township
- 19N
- Range
- 1W
- Section
- 32
- Base
- HB&M
- Other Location Info
- City/Nearest Community: Smith River
Notice of Determination
- Approving Agency
- Del Norte County Planning Commission
- Approving Agency Role
- Lead Agency
- Approved On
- Final Environmental Document Available at
- Del Norte County Community Development, 981 H Street, Ste 110, Crescent City CA 95531
Determinations
- (1) The project will have a significant impact on the environment
- No
- (2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
- No
- (2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
- Yes
- (2c) An other document type was prepared for this project pursuant to the provisions of CEQA
- No
- (3) Mitigated measures were made a condition of the approval of the project
- Yes
- (4) A mitigation reporting or monitoring plan was adopted for this project
- N/A
- (5) A Statement of Overriding Considerations was adopted for this project
- No
- (6) Findings were made pursuant to the provisions of CEQA
- Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.