48-inch Force Main Reliability Improvement Project (CIP No. 6001)

3 Documents in Project

Summary

SCH Number
2012082080
Lead Agency
South Bayside System Authority
Document Title
48-inch Force Main Reliability Improvement Project (CIP No. 6001)
Document Type
MND - Mitigated Negative Declaration
Received
Present Land Use
vacant and open space; developed; roadways/Tidal Plain; General Commercial / Open Space Preservation; Mixed Use Waterfront
Document Description
SBSA is proposing to construct and install a replacement 48-inch high density polyethylene (HDPE) sewer force main. The 48-inch (project) section of the force main is located between the Redwood City and San Carlos Pump Stations within the cities of San Carlos and Redwood City. The project is part of the SBSA's overall Capital Improvement Program which replaces and upgrades aging infrastructure, and will ensure the reliable operation of the overall sanitary sewer conveyance system. The new force main is intended to reduce the likelihood of spills and discharge of untreated wastewater to surrounding environments, which has occurred with the existing reinforced concrete pipe sewer force main. The existing 48-inch force main would remain in place but not function as a sewage transmission line.

Contact Information

Name
Robert Donaldson
Agency Name
South Bayside System Authority
Contact Types
Lead/Public Agency

Location

Cities
Redwood City, San Carlos
Counties
San Mateo
Zip
94063
Total Acres
14650
State Highways
Hwy 101
Railways
UPRR/Caltrain
Airports
San Carlos
Waterways
Redwood/ Pulgas, and Cordilleras Creek, Smith Slough
Township
5S
Range
3W
Section
18
Base
MDB&M

Notice of Completion

State Review Period Start
State Review Period End
State Reviewing Agencies
California Department of Fish and Wildlife, Bay Delta Region 3 (CDFW), California Department of Parks and Recreation, California Department of Transportation, District 4 (DOT), California Native American Heritage Commission (NAHC), California Public Utilities Commission (CPUC), California Regional Water Quality Control Board, San Francisco Bay Region 2 (RWQCB), California State Lands Commission (SLC), Department of Toxic Substances Control, Department of Water Resources, Resources Agency, San Francisco Bay Conservation and Development Commission (BCDC), State Water Resources Control Board, Division of Water Quality
Development Types
Other (Replacement of Sewer Force Main)
Local Actions
MOU
Project Issues
Aesthetics, Agriculture and Forestry Resources, Air Quality, Biological Resources, Coastal Zone, Cultural Resources, Cumulative Effects, Drainage/Absorption, Economics/Jobs, Flood Plain/Flooding, Geology/Soils, Growth Inducement, Hazards & Hazardous Materials, Hydrology/Water Quality, Land Use/Planning, Mineral Resources, Noise, Population/Housing, Public Services, Recreation, Schools/Universities, Septic System, Sewer Capacity, Solid Waste, Transportation, Vegetation, Wetland/Riparian, Wildfire

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print