NVSSP Drainage Master Plan Improvements and Bridge Replacement (Lake or Streambed Alteration Agreement No. 1600-2018-0075-R2)

5 Documents in Project

Summary

SCH Number
2012082033
Lead Agency
Sacramento County
Document Title
NVSSP Drainage Master Plan Improvements and Bridge Replacement (Lake or Streambed Alteration Agreement No. 1600-2018-0075-R2)
Document Type
NOD - Notice of Determination
Received
Posted
7/31/2018
Present Land Use
Pre-2030 Thoroughfare
Document Description
CDFW has executed Lake and Streambed Alteration Agreement No. 1600-2018-0075-R2, pursuant to section 1602 of the Fish and Game Code to the project Applicant, Keith Gotwalt. The proposed project includes the replacement of the Elk-Grove Florin Road Bridge and channel modification as a part of the North Vineyard Station Specific Drainage Master Plan. The new structure and channel will increase flood-flow capacity with the intent of increasing public safety and keeping the integrity of infrastructure during flood events. The project will include the replacement of an outfall and an overland release to support the new channel infrastructure.

Contact Information

Name
Dylan Wood
Agency Name
CDFW
Contact Types
Lead/Public Agency

Location

Counties
Sacramento
Cross Streets
Gerber Road / Florin Road
Zip
95829
Total Acres
3.1
Railways
CCTRR
Schools
Florin HS, Sheldon HS
Waterways
Gerber Creek
Township
7N
Range
6E
Section
1/6
Other Location Info
Elk Grove-Florin Road/Elder Creek

Notice of Determination

Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print