Live Oak Soccer Park and Stormwater Detention Facility

4 Documents in Project

Summary

SCH Number
2012082001
Lead Agency
Live Oak, City of (City of Live Oak)
Document Title
Live Oak Soccer Park and Stormwater Detention Facility
Document Type
NOD - Notice of Determination
Received

Document Description
A Supplemental Initial Study/Mitigated Negative Declaration was prepared for the project and circulated to the general public and to public agencies for review and comment from Oct. 23, 2014 to Nov. 22, 2014. The proposed project elements not previously analyzed in the City's adopted IS/MND or the EIS/EIR prepared and adopted by the Sutter Butte Flood Control Agency (SBFCA) include a stormwater outfall drain into Reclamation District 777's Lateral Drain Number 2 (channel); a 3-foot deep saddle for surface water overflow into the channel; and a slope reduction of the channel on the western property line of the project site. In addition, the well and utility area are proposed to be moved from the end of Linda Street in the northeast corner of the project site, as it was determined to be infeasible to connect a three-phase electrical system at the previously analyzed location. As a result, the well and utility area will be located near the southwest corner of the project site.

Contact Information
Angela Spain
City of Live Oak
9955 Live Oak Boulevard
Live Oak, CA 95953

530-695-2112

Location

Coordinates
39°15'47.5"N 121°40'1"W
Cities
Live Oak
Counties
Sutter
Cross Streets
Ida St & Linda St.
Zip
95953
Total Acres
26
Parcel #
09-25-23
State Highways
Hwy 99
Railways
UPRR
Airports
Bowles
Schools
Live Oak Unified School
Waterways
Feather River
Township
16N
Range
3E
Section
5
Base
MDB&M

Notice of Determination

Approving Agency
City of Live Oak City Council
Approving Agency Role
Lead Agency
Approved On
Final EIR Available Location
9955 Live Oak Blvd., Live Oak, CA 95953.

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A Statement of Overriding Considerations was adopted for this project
No
(5) Findings were made pursuant to the provisions of CEQA
Yes
Download CSV New Search