Import of Fill to Warm Creek Conservation Basins Project
2 Documents in Project
Summary
SCH Number
2012081044
Lead Agency
San Bernardino Flood Control District
Document Title
Import of Fill to Warm Creek Conservation Basins Project
Document Type
NOD - Notice of Determination
Received
Posted
9/10/2014
Present Land Use
LU: Unused-flood Control Basins: / City of Colton - Open Space, Industrial Park: City of San Bernardino - Commercial
Document Description
CDFW is executing a Lake and Streambed Alteration Agreement (SAA # 1600-2013-0079-R6) pursuant to Section 1602 of the Fish and Game Code to the project Applicant: San Bernardino County Flood Control District, represented by Mr. Annesley Ignatius, 825 East Third Street, San Bernardino, State of California, 92415, Phone (909) 387-7913. Work within the property is limited to the fill of the basins. The drainages will no longer flow into the basin inverts, and the remaining flow will be concentrated in a bio-infiltration swale in the easternmost portion of the basins terminating at the downstream Warm Creek Channel outlet at the downstream portion of basin 4. The proposed project impacts include the fill of the toe or invert of the basins and conversion of the drainages and basin invert to a bio-infiltration swale. Project impacts consist of the entirety of the Warm Springs Basin complex and the future maintenance of the bio-infiltration swale.
Contact Information
Name
Claire Ingel
Agency Name
CDFW Inland Deserts Region 6
Contact Types
Lead/Public Agency
Phone
Location
Coordinates
Cities
Colton, San Bernardino
Counties
San Bernardino
Cross Streets
Auto Plaza Drive, I-215 and Fairway Drive
Zip
92408
Total Acres
94
State Highways
I-215, I-10
Railways
UPRR, SB-Metrolink
Airports
Norton AFB
Schools
ES, MS, HS
Waterways
Warm Creek, Lytle Cajon, Lytle (East Branch), San Ana
Township
1S
Range
4W
Section
21
Base
SBB&M
Notice of Determination
Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA