Subsequent Mitigated Negative Declaration and Mitigation Monitoring and Reporting Program ,Site Plan No. SP-043-2017, Tentative Tract Map No. TT-17455, and Deve

5 Documents in Project

Summary

SCH Number
2012081036
Lead Agency
City of Garden Grove
Document Title
Subsequent Mitigated Negative Declaration and Mitigation Monitoring and Reporting Program ,Site Plan No. SP-043-2017, Tentative Tract Map No. TT-17455, and Deve
Document Type
NOD - Notice of Determination
Received
Posted
11/7/2017
Present Land Use
vacant lot/planned unit development no. PUD-128-12/International west mixed use
Document Description
A request for approval of a Site Plan, Tentative Tract Map, and Development Agreement to implement a previously approved resort hotel development project on "Site C" at the Northwest corner of Harbor boulevard and Twintree Lane in the City of Garden Grove. in 2012, the Garden Grove City Council approved General Plan Amendment No. GPA-2-12(b) and Planned Unity Development No. PUD-128-12 and adopted a MND and Mitigation Monitoring and Reporting Program to facilitate the future development of a resort hotel project on Site C. As approved in 2012, the Site C project called for up to 769 rooms in one (1) full service hotel and up to two (@) limited service hotels ranging from 10-19 stories; associated conference/meeting/banquet space, several restaurants; an indoor entertainment venue; and a multi-level parking garage with 1,297 total spaces on a 5.2 acre site, as depicted on a conceptual site plan (the "2012" Project"). Modifications to the project adopted in 2012 are now proposed in conjunction with the proposed Site Plan. The Modified Project includes the same number of hotels, hotel rooms, and maximum building heights as the 2012 Project, but the configuration of the buildings, the amount and type of ancillary uses and the site access have been modified. The Modified Project generally includes: (1) a change to two (2) full service hotels and one (1) limited service hotel; (2) changes to on-site circulation and access, including a new second driveway along Harbor Boulevard at the most southerly portion of the site, and changes to the parking structure including one entrance instead of the previous two entrances and one level of subterranean parking (maintaining the same 1,297 total spaces approved in the 2012 Project); (3) the introduction of retail uses; (4) minor changes to the total square footage of conference/meeting banquet space, restaurant/retail/entertainment space, hotel ancillary uses (such as gyms, spas, salon, a hotel shop, and a kids club) and hotel restaurant space; and (5) modifications to the 2012 Project's building placements and configuration including (a) shifting the placement of Hotel A to maintain a 5-foot setback from the north property line, a 10-foot setback from the east property line, and expanding the hotel's second floor terrace along the northerly portion of the property line toward Harbor Blvd., constructing a new retail building at the northwest corner of the site that connects to Hotel A via a second floor terrace, and relocating the valet drop-off for Hotel A; (b) swapping the placement of Hotel B with a restaurant pad building so that the restaurant pad is located at the southwest corner of the project site and Hotel B is located just north of the restaurant pad building with a connection provided between both structures via the hotel's second floor terrace; and (c) expanding and reconfiguring the usable outdoor roof deck area of Hotel A, which includes increasing the height of certain portions of the outdoor roof deck area from 75 feet to 80 feet and 85 feet, while continuing to maintain the easterly most portion of the parking structure at a height of 75 feet. The size of the Modified Project site has been reduced from 5.2 acres to 4.3 acres. The proposed Tentative Tract Map will adjust the rear property lines of four existing City-owned parcels located at the Northeast corner of the site on Cholsser Road to incorporate a portion of these parcels into the Modified Project site and will consolidate the existing parcels on the Modified Project site into two lots to facilitate development of the Modified Project and future commercial condominiumization. The Planning Commission also recommended approval of a Development Agreement with the developer of the Modified Project that would merely implement the approved Site Plan and Tentative Map.

Contact Information

Name
Maria Parra
Agency Name
City of Garden Grove
Contact Types
Lead/Public Agency

Location

Cities
Garden Grove
Counties
Orange
Cross Streets
Northwest corner of Harbor Boulevard and Twintree Lane, west of Choisser Road
Zip
92842
Total Acres
4.3
State Highways
SR 22, I-5, SR 57
Schools
Lampson, Parkview
Township
4S
Range
10W
Section
34

Notice of Determination

Approving Agency
City of Garden Grove
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print