Conditional Waiver of Waste Discharge Requirements for Agricultural Wastewater Discharges and Discharges

2 Documents in Project

Summary

SCH Number
2012081030
Lead Agency
Regional Water Quality Control Board, Region 7 (Colorado River Basin), Palm Desert
Document Title
Conditional Waiver of Waste Discharge Requirements for Agricultural Wastewater Discharges and Discharges
Document Type
NOD - Notice of Determination
Received
Posted
10/12/2012
Document Description
This regulatory action is for a proposed Conditional Waiver of Waste Discharge Requirements (WDRs). The intent of the Conditional Waiver is to ensure agricultural wastewater discharges and discharges of wastes from drain maintenance in the Palo Verde Valley and Palo Verde Mesa, occur in a manner that does not adversely affect the beneficial uses defined in the Basin Plan for the Palo Verde Valley Drains, and the Palo Verde Valley Lagoon and Outfall Drain. Accordingly, the proposed Conditional Waiver establishes conditions for agricultural wastewater discharges originating within the Valley and Mesa. The Conditional Waiver also establishes conditions for drain maintenance discharges that occur as a result of drain operation and maintenance (O&M) activities.

Contact Information

Name
Liann Chavez
Agency Name
Colorado River Regional Water Quality Control Board
Contact Types
Lead/Public Agency

Location

Cities
Blythe
Counties
Imperial, Riverside
Cross Streets
I-10 and Hwy 78
Zip
92225
Airports
Blythe
Waterways
Colorado River, Palo Verde Outfall Drain

Notice of Determination

Approving Agency
Colorado River Basin Regional Water Quality Control Board
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print