Folsom Dam Modification Project - Approach Channel

4 Documents in Project

Summary

SCH Number
2012072039
Lead Agency
Central Valley Flood Protection Board
Document Title
Folsom Dam Modification Project - Approach Channel
Document Type
NOD - Notice of Determination
Received
Posted
3/27/2013
Document Description
Note: Reference SCH #2006022091 The U.S. Army Corps of Engineers and the Central Valley Flood Protection Board have prepared a Supplemental EIS/EIR that proposes design refinements to the Final EIS/EIR prepared in 2007 for the Folsom Dam Safety and Flood Damage Reduction Joint Federal Project (JFP). This document evaluates the potential environmental impacts from recent design refinements for: 1) the construction and excavation of the 1,100 foot approach channel upstream of the auxiliary spillway and gated control structure, 2) the potential stockpiling and disposal of excavated material at any of the 5 sites (Mormon Island Auxiliary Dam, Dike 7, Dike 8, Spur-dike and in-reservoir), and 3) the associated features for the JFP.

Contact Information

Name
Vincent Heim
Agency Name
Central Valley Flood Protection Board
Contact Types
Lead/Public Agency

Location

Cities
Folsom
Counties
Sacramento

Notice of Determination

Approving Agency
Central Valley Flood Protection Board
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes