Fortuna Maintenance Station

3 Documents in Project

Summary

SCH Number
2012072012
Lead Agency
California Department of Transportation, District 3
Document Title
Fortuna Maintenance Station
Document Type
NOD - Notice of Determination
Received
Posted
11/13/2012
Present Land Use
Zoned
Document Description
The scope of the project includes the excavation and off-site disposal of soil that is contaminated by petroleum products which leaked from previously removed underground storage tanks. The soil, aggregate and groundwater will be disposed of at certified disposal sites. The estimated depth of excavation is between three and eight feet. After excavation and removal of the contaminated soil, imported fill will be used as backfill. The removed asphalt structural section will also be reconstructed as part of the scope of this work. Incidental work at the site may include replacement of existing utilities, soil testing, sheet pile installation and monitoring well abandonment. Construction is expected to last approximately four weeks.

Contact Information

Name
Sandra Rosas
Agency Name
California Department of Transportation, District 3
Contact Types
Lead/Public Agency

Location

Cities
Fortuna
Counties
Humboldt
Cross Streets
North Fortuna Blvd and Smith Lane in Fortuna, CA
Zip
95540
Total Acres
1.88
Parcel #
04029103
State Highways
Hwy 101
Schools
High School
Waterways
Eel River
Township
2N
Range
1W
Section
2

Notice of Determination

Approving Agency
Caltrans
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.