Via Ballena Storm Drain Relocation

2 Documents in Project

Summary

SCH Number
2012071083
Lead Agency
San Clemente, City of (City of San Clemente)
Document Title
Via Ballena Storm Drain Relocation
Document Type
NOD - Notice of Determination
Received

Document Description
Note: Review per lead As a result of severe winter storms and heavy rains from 12/17/2010 to 1/4/2011, a slope failure occurred behind homes located at 243, 245, 247, and 249 Via Ballena, resulting in the storm drain pipe being severed from the top of the slope behind homes at 249 and 251 via Ballena. The severed 18-inch corrugated metal pipe storm drain conveyed surface runoff from the street Via Ballena and the rest of the tributary area to a waterway that runs at the base of the slope within the Shorecliffs Golf Course. An emergency pipeline repair has extended a temporary storm drain pipe for the severed portion of the pipeline. The City is proposing to divert the street flow that was conveyed through the severed storm drain to a pipeline to be constructed within public streets, Via Ballena and Via Cascadia, to connect to the existing storm facility on Via Cascadia as shown on enclosed Exhibit B. The project will start at 249 Via Ballena and will include a 1,032 linear feet of 42-inch diameter pipe and 1,430 linear feet of 24-inch diameter pipe to be constructed within public street right-of-way.

Contact Information
Amir K. Ilkhanipour
City of San Clemente
910 Calle Negocio
San Clemente, CA 92673

949 361 6140

Location

Cities
San Clemente
Counties
Orange
Cross Streets
Via Ballena and Via Cascadita
Zip
92673
State Highways
I-5
Railways
OCTA
Schools
Capistrano USD
Waterways
Pacific Ocean

Notice of Determination

Approving Agency
City of San Clemente
Approved On
Final EIR Available Location
City of San Clemente Engineering Division 910 Calle Negocio, Suite 100, City of San Clemente, CA 92673

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A Statement of Overriding Considerations was adopted for this project
N/A
(5) Findings were made pursuant to the provisions of CEQA
N/A