SR 25 Curve Correction; (CA Endangered Species Act (CESA) Incidental Take Permit No. 2081-2014-010-04 (ITP))

8 Documents in Project

Summary

SCH Number
2012071077
Lead Agency
Caltrans 5 (San Luis Obispo) (California Department of Transportation, District 5)
Document Title
SR 25 Curve Correction; (CA Endangered Species Act (CESA) Incidental Take Permit No. 2081-2014-010-04 (ITP))
Document Type
NOD - Notice of Determination
Received

Document Description
The project involves realigning the 0.4 mile section of SR 25 to current design standards by replacing the nonstandard curve with a 2,000 foot radius curve. This will require cutting into the hillside to a maximum depth of 44 feet. The new section of SR 25 would be 900 feet long and 40 feet wide, with two 12-foot lanes, 2-foot paved shoulders and 6 to 8 feet of unpaved surface on either side of which includes a rock catchment area. The slopes on either side would be 0.25:1 or flatter. The width of these slopes will be a maximum of 16 feet on each side. In addition to the new section of road improvements two new driveways exits for the landowners on either side of SR 25 will be installed as well as access to a stockpile area in the current turn-out. The project may result in incidental take of California tiger salamander, which is designated as a threatened species under CESA. The ITP referenced above as issued by CDFW authorizes incidental take of species listed under CESA that may occur as a result of Project Implementation.

Contact Information
Laura Pennebaker-Diaz
CDFW
Central Region 1234 East Shaw Avenue
Fresno, CA 93710

559 243-4014 x225

Location

Counties
San Benito
Zip
95043
Parcel #
adjacent to 028-160-023
State Highways
Hwy 25
Railways
No
Airports
No
Schools
No
Waterways
San Benito River
Other Location Info
City/Nearest Community: Paicines

Notice of Determination

Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On
Final EIR Available Location
Caltrans 50 Higuera Street San Luis Obispo, CA 93501

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A Statement of Overriding Considerations was adopted for this project
No
(5) Findings were made pursuant to the provisions of CEQA
No
Download CSV New Search