Garrapata State Park Coastal Habitat Restoration and Trail Improvements

2 Documents in Project

Summary

SCH Number
2012071053
Lead Agency
California Department of Parks and Recreation
Document Title
Garrapata State Park Coastal Habitat Restoration and Trail Improvements
Document Type
NOD - Notice of Determination
Received
Posted
9/5/2012
Present Land Use
Open Space Recreation (Coastal Zone)
Document Description
The proposed project includes restoration of coastal habitat and improvements to the California Coastal Trail (Coastal Trail). The project proposes to close and remove 6.3 miles of non-system trail segments in order to protect and restore Smith's blue butterfly habitat, protect archaeological sites, and address on-going accelerated erosion. The project also proposes to clearly designate and improve the Coastal Trail segments, totaling 3.1 miles. Proposed Coastal Trail improvements include capping the existing trail bed with an aggregate base, installing two new foot bridges and one puncheon (a low bridge with no hand railings) crossing at Soberness and Doud Creek crossings, replacing wood and cable steps, designating and improving overlook sites, and installing signage. These trails would be accessed from a total of 17 existing trailheads. Trail use would continue to be limited to pedestrian use only.

Contact Information

Name
Larry Tierney
Agency Name
Department of Parks and Recreation
Contact Types
Lead/Public Agency

Location

Cities
Carmel-by-the-Sea
Counties
Monterey
Cross Streets
Hwy 1
State Highways
Hwy 1
Waterways
Pacific Ocean, Soberanes, Granite, & Doud Creeks

Notice of Determination

Approving Agency
California Department of Parks and Recreation
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
Yes