Permit for D/K Environmental Hazardous Waste Transfer and Storage Facility (CAT080033681)

2 Documents in Project

Summary

SCH Number
2012071034
Lead Agency
Toxic Substances Control, Department of (Department of Toxic Substances Control)
Document Title
Permit for D/K Environmental Hazardous Waste Transfer and Storage Facility (CAT080033681)
Document Type
NOD - Notice of Determination
Received

Document Description
The project involves the issuance of a Hazardous Waste Facility Permit (Permit) for the D/K Environmental (DKE) Hazardous Waste Transfer and Storage Facility by the Department of Toxic Substances Control (DTSC), as authorized by the California Health and Safety Code, Chapter 6.5, and the Resources, Conservation and Recovery Act (RCRA). In January 2011, DKE submitted its permit request to continue its hazardous waste storage and transfer activities. Upon issuance of a RCRA permit, DKE will become a RCRA Permitted Facility for transfer and storage activities for RCRA, and California Regulated Wastes received from off-site generators. No treatment, disposal, and recycling of hazardous waste will be performed at the facility.

Contact Information
Farshad T. Vakili
Department of Toxic Substances Control
8800 Cal Center Drive
Sacramento, CA 95826-3200

916 255 3612

Location

Coordinates
34°0'38.76"N 118°12'12.82"W
Cities
Los Angeles Vernon Vernon, Los Angeles, City of
Counties
Los Angeles
Cross Streets
3650 E. 26th Street near S. Downey Road
Zip
90058
Total Acres
2.4
Parcel #
8-25
State Highways
Hwy 5, 10, 101, 710
Airports
No
Waterways
Los Angeles River
Township
2S
Range
13W

Notice of Determination

Approving Agency
DTSC
Approving Agency Role
Lead Agency
Approved On
Final EIR Available Location
Department of Toxic Substances Control, 8800 Cal Center Drive, Sacramento, CA 95826

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A Statement of Overriding Considerations was adopted for this project
No
(5) Findings were made pursuant to the provisions of CEQA
Yes
Download CSV New Search