Streambed Alteration Agreement 1600-2012-022-R2 Taylor THP (2-11-020-PLU)

Summary

SCH Number
2012069005
Lead Agency
Fish & Game #2
Document Title
Streambed Alteration Agreement 1600-2012-022-R2 Taylor THP (2-11-020-PLU)
Document Type
NOD - Notice of Determination
Received
Posted
6/6/2012
Document Description
The California Department of Fish and Game is executing Lake or Streambed Alteration Agreement number 1600-2012-022-R2, pursuant to Section 1602 of the Fish and Game Code to the project applicant, Sierra Pacific Industries. The overall project for the purposes of this agreement shall be limited to the two projects below. The Permittee shall adhere to all avoidance and minimization measures provided in the timber harvest plan (THP) that may provide more environmental protections than what is listed in the Agreement. Project 1 (THP Reference Point #3) Temporary Bridge or Culverts at Taylor Creek: A prefabricated metal bridge or five or more 6" (or greater) well castings or culverts (modified rock ford). Project 2 (THP Reference Point #5) Rock Ford at Sockum Creek. This crossing shall be installed at current skid crossing location, and shall consist of placing 3-6" washed clean rock along the road for 75 feet on each side of the crossing. Rock shall be installed when crossing is dry. No vegetation shall be removed as part of the project.

Contact Information

Name
Julie C. Newman
Agency Name
California Department of Fish and Game
Contact Types
Lead/Public Agency

Location

Counties
Plumas

Notice of Determination

Approving Agency
Department of Fish and Game
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print