MJUSD New Middle School and District Use Site Project SAA 1600-2013-0254-R2

5 Documents in Project

Summary

SCH Number
2012062076
Lead Agency
Marysville Unified School District
Document Title
MJUSD New Middle School and District Use Site Project SAA 1600-2013-0254-R2
Document Type
NOD - Notice of Determination
Received
Posted
5/1/2014
Present Land Use
Designated by the East Linda Specific Plan as "Public Facilities-School"
Document Description
The California Department of Fish and Wildlife is executing Streambed Alteration Agreement Number #1600-2013-0254-R2, pursuant to Section 1602 of the Fish and Game Code to the project applicant, Marysville Joint Unified Schools District. The overall Project a comprised of an approximately 1,168 student middle school, a 460 student alternative high school, 100 student adult education center and school, and education support facilities. The middle school site includes a full sized soccer field, softball fields, a track, and other multiuse field with lighting sufficient to allow nighttime events. Work within the Linda Drain will include the construction of three culvert crossing. At each crossing the Linda Drain will be filled to allow for the placement of a 54-inch diameter culvert. The culverts have been sized to convey a 100 year storm event. A headwall will be placed at each end of the culvert to help prevent possible erosion of the slope banks.

Contact Information

Name
Kursten Sheridan
Agency Name
California Department of Fish and Wildlife
Contact Types
Lead/Public Agency

Location

Cities
Marysville
Counties
Yuba
Cross Streets
2176 Hammonton-Smartsville Road
Zip
95901
Total Acres
50
Parcel #
021-150-032
State Highways
Hwy 70
Schools
Yuba College
Waterways
Yuba River
Township
15
Range
4E
Section
21

Notice of Determination

Approving Agency
Department of Fish and Wildlife
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No