Geary Road Bridge Replacement Project

2 Documents in Project

Summary

SCH Number
2012062038
Lead Agency
City and County of San Francisco
Document Title
Geary Road Bridge Replacement Project
Document Type
NOD - Notice of Determination
Received
Posted
9/28/2012
Present Land Use
Existing Bridge/Open Space
Document Description
The San Francisco Public Utilities Commission (SFPUC) proposes to replace the existing Geary Road Bridge with a new bridge at the existing location to accommodate current load requirements and eliminate the need for a low water crossing. The new bridge is of a similar scale to the existing bridge, and would include a single lane spanning approximately 150 feet over Alameda Creek. The proposed project is on SFPUC property in in unincorporated Alameda County, within the Sunol Regional Wilderness. The existing bridge is located at the end of Geary Road, where it crosses Alameda Creek and connects to Camp Ohlone Road. The bridge alignment is approximately 6 miles south of the intersection of Calaveras Road and Interstate 680 (I-680), and approximately 3 miles south of the intersection of Calaveras Road and Geary Road. The nearest community is the town of Sunol, located approximately 7 miles north of the project site. Access to the existing bridge is controlled by locked games.

Contact Information

Name
Steve H. Smith
Agency Name
San Francisco Planning Department
Contact Types
Lead/Public Agency

Location

Counties
Alameda
Cross Streets
Geary Road
Total Acres
8
Waterways
Alameda Creek; Leyden Creek
Township
5S
Range
1E
Section
11
Other Location Info
City/Nearest Community: Sunol

Notice of Determination

Approving Agency
County of San Francisco
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
N/A

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.