Laguna Flood Control Improvement Project

2 Documents in Project

Summary

SCH Number
2012062003
Lead Agency
City of Burlingame
Document Title
Laguna Flood Control Improvement Project
Document Type
NOD - Notice of Determination
Received
Posted
8/18/2014
Present Land Use
City Street and State Highway/Road Right-of-way
Document Description
The Project includes installation of a tidal flapgate and a box culvert with a concrete headwall on Sanchez Creek and placement of 120 square feet of rock rip rap and excavation of accumulated sediment and overgrown vegetation from a storm water drainage ditch which flows into Sanchez Creek, in the city of Burlingame, San Mateo County. The Project will alleviate flooding and facilitate storm water discharge into Sanchez Creek from the surrounding developed areas. The 5-foot by 10-foot box culvert will be installed under Carolan Avenue parallel to and north of the Caltrain tracks and will be installed via open cut trenching construction. Approximately 500 cubic yards of sediment will be removed from the drainage ditch and will be off-hauled and disposed of an appropriately licensed facility. Installation of the tidal flapgate will occur in a culverted portion of Sanchez Creek near Rollins Road. CDFW is executing a Lake and Streambed Alteration Agreement. Number 1600-2012-0179-R3, pursuant to Section 1602 of the Fish and Game Code to the project Permittee, City of Burlingame.

Contact Information

Name
Suzanne DeLeon
Agency Name
CDFW Bay Delta Region
Contact Types
Lead/Public Agency

Location

Cities
Burlingame
Counties
San Mateo
Cross Streets
Carolan Avenue and Toyon Drive
Zip
94010
Total Acres
<0.5
Parcel #
026231999, 8; 02197010; 093361010
State Highways
Hwy 101, SR 82
Railways
Caltrain
Schools
Burlingame HS, Palcare
Waterways
Sanchez Creek, Burlingame Lagoon, SF Bay
Base
MDB&M

Notice of Determination

Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
N/A
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
N/A

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.