Jaye Street Bridge Widening Project (Lake or Streambed Alteration Agreement No. 1600-2014-0041-R4)

4 Documents in Project

Summary

SCH Number
2012061082
Lead Agency
Porterville, City of (City of Porterville)
Document Title
Jaye Street Bridge Widening Project (Lake or Streambed Alteration Agreement No. 1600-2014-0041-R4)
Document Type
NOD - Notice of Determination
Received
Posted
5/24/2016
Present Land Use
Not applicable, City of Porterville Right-of-Way

Document Description
To widen the Jaye Street Bridge from two to four lanes and reconstruct the street approaches; realign the Hubbs Minor Ditch located underneath the bridge and construct a box culvert; construct a bike path underneath the bridge at the south abutment; construct retaining walls on the south bank; existing sewer and water lines attached to the west edge of the bridge deck will be replaced in-kind; relocate an existing gas line to the widened east edge of the deck; place rock slope protection (RSP) on both banks in front of the abutments and along portions of the bank and the piers.

Contact Information
James Herota
Central Valley Flood Protection Board
3310 El Camino Ave., Room 151
Sacramento, CA 95821

Phone : (916) 574-0651

Location

Coordinates
36°3'23"N 119°1'35"W
Cities
Porterville
Counties
Tulare
Cross Streets
Jaye Street between Date Avenue and Springville Avenue
Zip
93257
Total Acres
3.9
State Highways
Hwy 190
Schools
Porterville HS
Waterways
Tule River
Township
21S
Range
27E
Section
35
Base
MDB&M

Notice of Determination

Approving Agency
Central Valley Flood Protection Board
Approving Agency Role
Responsible Agency
Final Environmental Document Available at
3310 El Camino Ave., Room 151, Sacramento, CA 95821

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.