Lots 1-93 in Portola Center Northeast, Site Development Permit 08-18-5212

26 Documents in Project

Summary

SCH Number
2012061063
Lead Agency
Lake Forest, City of (City of Lake Forest)
Document Title
Lots 1-93 in Portola Center Northeast, Site Development Permit 08-18-5212
Document Type
NOD - Notice of Determination
Received
Posted
10/1/2018
Present Land Use
Various

Document Description
Site Development Permit 02-18-5212 for the "The Oaks" development project consisting of Lots 1-93 in Portola Center Northeast is a request to approve floor lans and architecture for 93 homes on previously approved lots in Portola Center Northeast. The project was evaluated in and contemplated by the Subsequent EIR that was prepared for the Portola Center project (SCH# 2012061063) and ceritifed by the City of Lake Frest City Council on November 5, 2013. The Portola Center certified SEIR was not challenged withint he time period prescribed in subdivision of Public Resources Code section 21167 and thus the SEIR is presumed valid in accordance with Public Resources Code section 21167.2. The proposed project is consistent with the scope of the apprived Area Plan and Tentative Tract Map 17300. Therefore, the certified SEIR serves as the environmental documentation for the project and the project is in compliance with the requirements of CEQA.

Contact Information
Marie Luna
City of Lake Forest
25550 Commercentre Drive
Lake Forest, CA 92630

Phone : (949) 461-3466
mluna@lakeforestca.gov

Location

Coordinates
33°40'18.03"N 117°38'3.04"W
Cities
Lake Forest
Counties
Orange
Cross Streets
Glenn Ranch Road/Saddleback Ranch Road
Zip
92630
Total Acres
195
Parcel #
Multiple
State Highways
SR-241
Schools
Portola Hills ES
Waterways
Aliso Creek
Township
6S
Range
7W
Base
SBB&M

Notice of Determination

Approving Agency
City of Lake Forest
Approving Agency Role
Lead Agency
Approved On
Final Environmental Document Available at
25550 Commercentre Dr., Suite 100, Lake Forest, CA 92630

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes
Download CSV New Search