Data Center Demonstration with Combined Heat and Power Technology

Summary

SCH Number
2012058146
Public Agency
California Energy Commission
Document Title
Data Center Demonstration with Combined Heat and Power Technology
Document Type
NOE - Notice of Exemption
Received
Posted
5/12/2012
Document Description
This research will demonstrate a novel hybrid uninterruptable power supply (UPS) microturbine technology operting in an efficient combined cooling, heating and power (CCHP) system at an operating data center. The demonstration will consist of three hybrid UPS microturbines connected to an absorption chiller installed at the Southern California Gas data center in Monterey Park. This project will take 33 months for design, installation, and measurement and verification. This time is necessary to ensure the microturbines can carry critical loads and meet reliability standards required for a data center for at least a year.

Contact Information

Name
Paul Roggensack
Agency Name
California Energy Commission
Contact Types
Lead/Public Agency

Location

Cities
Los Angeles, Los Angeles, City of
Counties
Los Angeles

Notice of Exemption

Exempt Status
Categorical Exemption
Type, Section or Code
S:15306
Reasons for Exemption
The project involves demonstratoin of a combined cooling, heating, and power system at a gas utility company's data center.

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print