Hatfield Pump Station Relocation Project
Summary
SCH Number
2012058028
Public Agency
Stevinson Water District
Document Title
Hatfield Pump Station Relocation Project
Document Type
NOE - Notice of Exemption
Received
Posted
5/2/2012
Document Description
Relocation of an existing pump station approximately 300 feet southerly from the current location. The project will include the installation of 4-10" piles, a 8' x 30' access platform, and 18" diameter discharge pipeline. After construction, the total project footprint will be less than 250 square feet.
Contact Information
Name
Bob Kelley
Agency Name
Stevinson Water District
Contact Types
Lead/Public Agency
Phone
Location
Counties
Merced
Notice of Exemption
Exempt Status
Categorical Exemption
Type, Section or Code
S:15303
Reasons for Exemption
Small Construction.
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.