Jack Tone Road Bridge Pile Repair and Scour Mitigation Project

3 Documents in Project

Summary

SCH Number
2012052057
Lead Agency
San Joaquin County
Document Title
Jack Tone Road Bridge Pile Repair and Scour Mitigation Project
Document Type
NOD - Notice of Determination
Received
Posted
12/26/2012
Present Land Use
Resource Conservation (OS/RC) for the General Plan and General Agriculture (AG Zone) for County Zoning
Document Description
The Project involves repairing an existing pile of the Jack Tone Road Bridge and installing rock slope protection. The Project consists of creating a uniform channel section through the Jack Tone Road Bridge area within Mormon Slough. The Mormon Slough channel will be cut and filled with a layer of rock slope protection. Soil will be excavated from the channel and south embankment to provide ample space for the placement of rock slope protection. The Jack tone Road Bridge also has damaged pile. The 16-inch diameter pile will be repaired by enlarging the diameter to 24 inches.

Contact Information

Name
Skyler Anderson
Agency Name
Central Valley Regional Water Quality Control Board
Contact Types
Lead/Public Agency

Location

Cities
Stockton
Counties
San Joaquin
Cross Streets
Jack Tone Road Bridge
Zip
95215
Total Acres
.95
State Highways
Hwy 4
Waterways
Mormon Slough
Township
1N
Range
7/8E
Section
1/6
Other Location Info
City/Nearest Community: Linden

Notice of Determination

Approving Agency
Central Valley Regional Water Quality Control Board
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print