Bon Air Road Bridge Replacement Project

6 Documents in Project

Summary

SCH Number
2012052052
Lead Agency
City of Larkspur
Document Title
Bon Air Road Bridge Replacement Project
Document Type
NOD - Notice of Determination
Received
Posted
8/6/2012
Present Land Use
Transportation facility

Document Description
The City proposes to replace the existing Bon Air Road Bridge with a new bridge that is 388 feet long and 62.5 feet wide. The bridge will generally follow the same alignment as the existing bridge with the north edge of the bridge extending approximately 13 feet beyond the north edge of the existing structure. The new bridge will reduce the number of spans and columns to less than half of the number that currently exist. The structure will carry one 12-foot lane of traffic in each direction and have a 6-foot Class 1 bicycle path and 5-foot sidewalk in each direction.

Contact Information
Hamid Shamsapour
City of Larkspur
Lead/Public Agency
400 Magnolia Avenue
Larkspur, CA 94939

Phone : (415) 927-5017

Location

Coordinates
37°56'41"N 122°32'17"W
Cities
Corte Madera Larkspur
Counties
Marin
Cross Streets
Bon Air Road and South Eliseo Drive
Zip
94939
Total Acres
2.7
Parcel #
022-060-18 & various for temp. easements
State Highways
Hwy 101
Schools
Marin Catholic HS
Waterways
Corte Madera Creek

Notice of Determination

Approving Agency
City of Larkspur
Approving Agency Role
Lead Agency
Approved On
Final Environmental Document Available at
400 Magnolia Avenue Larkspur, CA 94939

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print