Conergy Solar Project

4 Documents in Project

Summary

SCH Number
2012052049
Lead Agency
Sacramento, City of (City of Sacramento)
Document Title
Conergy Solar Project
Document Type
NOD - Notice of Determination
Received
Posted
5/8/2013
Present Land Use
A-open space

Document Description
The proposed project includes installation of solar modules, operation the modules to produce and sell electricity, and removal of the modules at the conclusion of the lease term. The solar facility would be designed to generate 1.4 megawatts alternating current. The project site is located on property owned by the City of Sacramento. Operation of the solar facility by Conergy, Inc. would be pursuant to lease agreement with the City of Sacramento. The proposed project includes the installation of solar modules on the ground and on shade structures. The ground-mounted modules would be located on a paved portion of the park site that immediately west of the existing Dog Park. Column-mounted structures would be located within the Dog Park and in other paved areas of the park site.

Contact Information
Dana Allen
City of Sacramento
300 Richards Boulevard
Sacramento, CA 95811

Phone : (916) 808-2762

Location

Cities
Sacramento
Counties
Sacramento
Cross Streets
28th Street/C Street
Parcel #
003-0042-002,003-0050-016,003-0010-001
State Highways
Bus. 80
Railways
UPRR
Waterways
American River

Notice of Determination

Approving Agency
City of Sacramento
Approving Agency Role
Lead Agency
Approved On
Final Environmental Document Available at
City of Sacramento, Development Services Department, Planning Division 300 Richards Boulevard, Third Floor, Sacramento, CA 95811

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.