Unionhouse Creek Channel Improvements Project

5 Documents in Project

Summary

SCH Number
2012052043
Lead Agency
Sacramento Area Flood Control Agency
Document Title
Unionhouse Creek Channel Improvements Project
Document Type
NOD - Notice of Determination
Received
Posted
6/22/2012
Present Land Use
Maintenance Right-of-Way, Transportation (Railway) Easement
Document Description
The proposed project consists of modifying the channel of Unionhouse Creek for approximately 1.6 miles, from immediately downstream (west) of Bruceville Road to upstream (east) of Franklin Boulevard in the City of Sacramento, CA. The actions include flood risk-reduction measure in two segments of the creek: relining the channel bottom and side slopes with concrete from Bruceville Rd. to Center Parkway, and widening the channel by and additional 8 feet, to a total width of 20 feet, from Center Parkway downstream to Franklin Blvd. The primary purpose of this effort is to increase the creek channel's capacity to contain 100 year storm flows within its banks.

Contact Information

Name
Pete Ghelfi
Agency Name
Sacramento Area Flood Control Agency
Contact Types
Lead/Public Agency

Location

Cities
Sacramento
Counties
Sacramento
Cross Streets
Cosumnes River Parkway and Franklin Blvd
Zip
95823
Total Acres
30
Parcel #
Florin Quadrangle
State Highways
I-5
Schools
Cosumnes River College
Waterways
Morrison Creek, Sacramento River
Township
7N
Range
5E
Section
15-17

Notice of Determination

Approving Agency
Sacramento Area Flood Control Agency
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.