Unionhouse Creek Channel Improvements Project
5 Documents in Project
Download CSV
New Search
Print
Summary
- SCH Number
- 2012052043
- Lead Agency
- Sacramento Area Flood Control Agency
- Document Title
- Unionhouse Creek Channel Improvements Project
- Document Type
- NOD - Notice of Determination
- Received
- Posted
- 6/22/2012
- Present Land Use
- Maintenance Right-of-Way, Transportation (Railway) Easement
- Document Description
- The proposed project consists of modifying the channel of Unionhouse Creek for approximately 1.6 miles, from immediately downstream (west) of Bruceville Road to upstream (east) of Franklin Boulevard in the City of Sacramento, CA. The actions include flood risk-reduction measure in two segments of the creek: relining the channel bottom and side slopes with concrete from Bruceville Rd. to Center Parkway, and widening the channel by and additional 8 feet, to a total width of 20 feet, from Center Parkway downstream to Franklin Blvd. The primary purpose of this effort is to increase the creek channel's capacity to contain 100 year storm flows within its banks.
- Contact Information
-
Pete Ghelfi
Sacramento Area Flood Control Agency
Lead/Public Agency
1001 7th Street, 7th Floor
Sacramento, CA 95814
Phone : (916) 874-7606
Location
- Coordinates
- 38°27'30.66"N 121°25'42.42"W
- Cities
- Sacramento
- Counties
- Sacramento
- Cross Streets
- Cosumnes River Parkway and Franklin Blvd
- Zip
- 95823
- Total Acres
- 30
- Parcel #
- Florin Quadrangle
- State Highways
- I-5
- Schools
- Cosumnes River College
- Waterways
- Morrison Creek, Sacramento River
- Township
- 7N
- Range
- 5E
- Section
- 15-17
Notice of Determination
- Approving Agency
- Sacramento Area Flood Control Agency
- Approving Agency Role
- Lead Agency
- Approved On
- Final Environmental Document Available at
- SAFCA, 1001 7th Street, 7th Floor, Sacramento, CA 95814
Determinations
- (1) The project will have a significant impact on the environment
- No
- (2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
- No
- (2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
- Yes
- (2c) An other document type was prepared for this project pursuant to the provisions of CEQA
- No
- (3) Mitigated measures were made a condition of the approval of the project
- Yes
- (4) A mitigation reporting or monitoring plan was adopted for this project
- N/A
- (5) A Statement of Overriding Considerations was adopted for this project
- No
- (6) Findings were made pursuant to the provisions of CEQA
- No
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.