McGregor Pump Station Project

2 Documents in Project

Summary

SCH Number
2012052038
Lead Agency
Soquel Creek Water District
Document Title
McGregor Pump Station Project
Document Type
NOD - Notice of Determination
Received
Posted
2/11/2013
Present Land Use
Vacant / Public Facility / Visitor Serving (PF/VS) / Public Facility and Visitor Serving
Document Description
The District proposes to acquire approximately 0.16-acre of the 4.31-acre city owned land to build a pump station that would move water between Service Areas 1 and 2. The capacity of the pump station on this project site could be expanded in the future, which would require installation of additional equipment in the building, but no additional ground disturbance. The project site is within 150 feet of SR-1 and immediately east of the entrance to New Brighton State Beach. The terrain has a southern aspect, gently sloping towards the Pacific Ocean with an elevation ranging from 80 to 100 feet above mean sea level. The site is covered with vegetated coast live oak and landscaped fruit trees. The lower portion of the proposed project site has a broad perennial freshwater seep wetland.

Contact Information

Name
Michael J. Wilson
Agency Name
Soquel Creek Water District
Contact Types
Lead/Public Agency

Location

Cities
Capitola
Counties
Santa Cruz
Cross Streets
McGregor Drive and Park Avenue
Zip
95003
Total Acres
.52
Parcel #
11S
State Highways
Hwy 1
Railways
SPRR
Schools
Montessori School-SC
Waterways
Tannery Gulch and Pacific Ocean
Township
11S
Range
1W
Section
11
Other Location Info
City/Nearest Community: Aptos

Notice of Determination

Approving Agency
Soquel Creek Water District
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.