California Waste Recovery Systems Recycling Processing Center Project
5 Documents in Project
Summary
SCH Number
2012052026
Lead Agency
City of Galt
Document Title
California Waste Recovery Systems Recycling Processing Center Project
Document Type
NOD - Notice of Determination
Received
Posted
6/20/2012
Present Land Use
The site is located within an existing Industrial Park and is developed, including a partially vacant 97,896 sf concrete tilt-up building. The site is zoned Light Manufacturing and the site's General Plan land use designation is Light Industrial.
Document Description
CA Waste Recovery Systems (Cal Waste) is currently located at 1065 Turner Road in Lodi, CA. The project applicant, Cal Waste, is proposing to relocate their trucks, drivers, shop employees, and office staff from the existing Lodi location to the proposed project site in order to centralize operations. Upon relocation, the existing Lodi location to the proposed project site in order to centralize operations. Upon relocation, the existing Lodi facility would be closed. Cal Waste proposes to operate a recycling processing center in the existing vacant on-site building. Operations of the recycling processing center would include receipt, sorting, processing, and shipping of recyclable materials. Approximately 150 tons per day of commingled single-stream recyclables generated from the City of Galt and surrounding communities would be received and processed. The recyclable materials would include, but would not be limited to, the following: newspaper; cardboard; mixed paper (junk mail, magazines, catalogs, etc.); various plastics; aluminum and bi-metal cans; and glass. Once separated by mechanical and/or manual methods, the recyclable materials would be processed and shipped to market. All recovered fiber, plastic, and metal materials would be baled for shipping. Market destinations would vary.
Contact Information
Name
Chris Erias
Agency Name
City of Galt Planning Department
Contact Types
Lead/Public Agency
Phone
Location
Coordinates
Cities
Galt
Counties
Sacramento
Zip
95632
Total Acres
6.68
Parcel #
150-0110-075
State Highways
SR 104, 99
Railways
UPRR
Schools
Yes
Township
5N
Range
6E
Section
21
Base
MDB&M
Notice of Determination
Approving Agency
City of Galt
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.