Bay Area Rapid Transit (BART) Fremont Line Operability Retrofit Project

2 Documents in Project

Summary

SCH Number
2012052009
Lead Agency
San Francisco Bay Area Water Transit Authority
Document Title
Bay Area Rapid Transit (BART) Fremont Line Operability Retrofit Project
Document Type
NOD - Notice of Determination
Received
Posted
7/5/2012
Document Description
To ensure public safety and protect the capital investment represented by the BART system, BART is upgrading the most heavily used and most vulnerable portions of the original system, which were constructed in 1972 using the latest seismic standards available at the time. The Fremont Line Operability Retrofit Project (Project) would upgrade the Fremont Line, which is a heavily used portion of the BART system, to an "Operability" Level of retrofit. For this level of seismic upgrade, facilities would be retrofitted to a degree at which BART would be able to resume operations shortly after a major earthquake. Operability retrofits would involve construction activities that primarily consist of strengthening the existing columns and footings that support aerial structures and stations. Ground disturbance around each pier to be retrofitted would take place within a 10-foot radius of the pier, on-site construction equipment would be placed within a 20-foot radius of each pier.

Contact Information

Name
Janie Layton
Agency Name
San Francisco Bay Area Rapid Transit District
Contact Types
Lead/Public Agency

Location

Cities
Oakland
Counties
Alameda
Cross Streets
18th Ave to Fruitvale Station; Ashland Ave; Fruitvale Station to Coliseum Station
State Highways
Hwy 77, 185, 238, 580, 880
Railways
UPRR
Airports
Oakland Int'l
Schools
6
Waterways
Alameda Creek Flood Control Channel
Other Location Info
San Lorenzo

Notice of Determination

Approving Agency
San Francisco Bay Area Rapid Transit District
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.