Daily II Tank Project - Second Addendum to IS/MND
8 Documents in Project
Summary
SCH Number
2012051075
Lead Agency
Eastern Municipal Water District
(EMWD)
Document Title
Daily II Tank Project - Second Addendum to IS/MND
Document Type
NOD - Notice of Determination
Received
Posted
11/17/2016
Present Land Use
Vacant/R-A-2 1/2/
Document Description
On July 26, 2012, the Eastern Municipal Water District's (Eastern) Board approved and authorized the CEQA certification of the Daily II Tank Project - Final IS/MND. The project consisted of constructing a 2-million gallon potable water storage tank, an access driveway and demolition of the Daily I Tank. Subsequently, on Oct. 2, 2013, the Board approved and authorized by an addendum to the IS/MND, minor design changes to the project that included balancing excess earthwork on the site.
Currently , Eastern proposes additional changes to the project that consist of drainage enhancements along Daily Road, and the addition of a complete operable hydro-booster station to replace several smaller private booster stations. Additionally, approx. 650 feet of 12-inch and approx. 175 feet of 4-inch diameter PVC pipeline would replace an existing 12-inch diameter steel pipeline. New meters and backflow preventers would be installed to provide service to existing connection.
Contact Information
Name
Helen Stratton
Agency Name
County Clerk, County of Riverside
Contact Types
Lead/Public Agency
Phone
Location
Coordinates
Cities
Menifee
Counties
Riverside
Cross Streets
Daily Road and Scott Road
Zip
92584
Total Acres
10.2
Parcel #
384-030-030 and 384-030-026
State Highways
I-215
Township
6S
Range
3W
Section
21
Base
SBB&M
Notice of Determination
Approving Agency
Eastern Municipal Water District
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.