Daily II Tank Project - Second Addendum to IS/MND

8 Documents in Project

Summary

SCH Number
2012051075
Lead Agency
Eastern Municipal Water District
Document Title
Daily II Tank Project - Second Addendum to IS/MND
Document Type
NOD - Notice of Determination
Received
Posted
11/17/2016
Present Land Use
Vacant/R-A-2 1/2/

Document Description
On July 26, 2012, the Eastern Municipal Water District's (Eastern) Board approved and authorized the CEQA certification of the Daily II Tank Project - Final IS/MND. The project consisted of constructing a 2-million gallon potable water storage tank, an access driveway and demolition of the Daily I Tank. Subsequently, on Oct. 2, 2013, the Board approved and authorized by an addendum to the IS/MND, minor design changes to the project that included balancing excess earthwork on the site. Currently , Eastern proposes additional changes to the project that consist of drainage enhancements along Daily Road, and the addition of a complete operable hydro-booster station to replace several smaller private booster stations. Additionally, approx. 650 feet of 12-inch and approx. 175 feet of 4-inch diameter PVC pipeline would replace an existing 12-inch diameter steel pipeline. New meters and backflow preventers would be installed to provide service to existing connection.

Contact Information
Helen Stratton
County Clerk, County of Riverside
27424 Gateway Drive
Riverside, CA 92502-0751

Phone : 951-928-3777x4545

Location

Coordinates
33°38'5.47"N 117°12'4.45"W
Cities
Menifee
Counties
Riverside
Cross Streets
Daily Road and Scott Road
Zip
92584
Total Acres
10.2
Parcel #
384-030-030 and 384-030-026
State Highways
I-215
Township
6S
Range
3W
Section
21
Base
SBB&M

Notice of Determination

Approving Agency
Eastern Municipal Water District
Approving Agency Role
Lead Agency
Approved On
Final EIR Available Location
27424 Gateway Dr., Riverside, CA 92502-0751

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A Statement of Overriding Considerations was adopted for this project
No
(5) Findings were made pursuant to the provisions of CEQA
No
Download CSV New Search