Operation of the Daily II Reservoir

8 Documents in Project

Summary

SCH Number
2012051075
Lead Agency
Eastern Municipal Water District (EMWD)
Document Title
Operation of the Daily II Reservoir
Document Type
NOD - Notice of Determination
Received
Posted
7/31/2012
Present Land Use
Vacant/R-A-2 1/2/
Document Description
EMWD proposes to construct a 2.0 million-gallon (MG) water storage tank, including a detention basin, and an access road on APNs 384-030-030 and 384-030-026 within the city of Menifee. The new Daily II tank would be an above ground welded steel tank measuring 32 feet in height, with an internal diameter of 102 feet. An overflow detention basin would be constructed to accommodate the project site's storm water flows, and any overflow from the tank. EMWD also proposes to construct a new 12-inch diameter water transmission pipeline, between the new Daily II tank site and the existing water pipeline in Scott Road. The pipeline would follow the new access road from the Daily II tank to Daily Road, proceeding in a northerly direction along Daily Road to the connection point in Scott Road. Following the construction of the Daily II tank, the existing Daily I tank located on APN 384-010-034, would be demolished.

Contact Information

Name
Helen Stratton
Agency Name
Eastern Municipal Water District
Contact Types
Lead/Public Agency

Location

Cities
Menifee
Counties
Riverside
Cross Streets
Daily Road and Scott Road
Zip
92584
Total Acres
10.2
Parcel #
384-030-030 and 384-030-026
State Highways
I-215
Township
6S
Range
3W
Section
21
Base
SBB&M

Notice of Determination

Approving Agency
Eastern Municipal Water District
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print