Serrano Creek Maintenance Project (SAA #1600-2011-0164-R5)
Summary
SCH Number
2012049006
Lead Agency
Fish & Game #5
Document Title
Serrano Creek Maintenance Project (SAA #1600-2011-0164-R5)
Document Type
NOD - Notice of Determination
Received
Posted
4/3/2012
Document Description
The project involves routine maintenance activities within the 1.1-mile reach of Serrano Creek described above. For the purposes of this long-term maintenance agreement, routine maintenance activities are defined as: vegetation removal and minor debris removal (including sediment, trash, and woody debris) to maintain the current channel alignment. The current channel alignment shall be maintained by incorporating a 50-foot maintenance zone. This 50-foot maintenance zone shall consist of a 10-foot wide thalweg zone, and a 20-foot wide medium-growth zone on both sides of the 10-foot thalweg zone (Figures 3a, 3b, and 3c). Maintenance within the 10-foot wide thalweg zone shall include removal of all non-herbaceous plants. Maintenance within the medium-growth zone shall involve the removal of any tree or shrub species larger than 2-inches in diameter (measured at the base), and the removal of any observed non-native species regardless of their size. Vegetation removal shall involve cutting plants at the base, and leaving the root systems in place. Sediment removal is limited to the outfall structures located throughout the 1.1 mile reach of Serrano Creek and shall only be accomplished using hand crews (no heavy equipment).
Contact Information
Name
Mr. Barabe
Agency Name
California Department of Fish and Game
Contact Types
Lead/Public Agency
Phone
Location
Counties
Orange
Notice of Determination
Approving Agency
DFG
Approving Agency Role
Responsible Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
No