Agnew Lake Geomembrane Installatino Project

Summary

SCH Number
2012048319
Public Agency
Fish & Game #6
Document Title
Agnew Lake Geomembrane Installatino Project
Document Type
NOE - Notice of Exemption
Received
Posted
4/25/2012
Document Description
CDFG is executing a Lake and Streambed Alteration Agreement pursuant to Section 1602 (SAA #1600-2012-0035-R6) of the Fish and Game Code to the project Permittee, Southern California Edison Co. Permittee proposes to the install a geomembrane liner on the upstream face of Agnew Lake Dam, repair the deteriorated concrete areas along the dam face, and conduct repairs to the trash rack and outlet system. To conduct the project, Permittee will draw down Agnew Lake prior to beginning work activities in August 2012, when lake levels are normally low and the dame face is exposed. The dam outlet valve will remain open for the duration of the project to allow natural flows to pass through Rush Creek. The geomembrane will be installed using swingstages and minimal scaffolding. Work is expected to take 6 weeks to complete.

Contact Information

Name
Tammy Branston
Agency Name
Department of Fish and Game, Region 7
Contact Types
Lead/Public Agency

Location

Counties
Mono
Other Location Info
Agnew Lake

Notice of Exemption

Exempt Status
Categorical Exemption
Type, Section or Code
Section 15301
Reasons for Exemption
Repairs and maintenance to an existing public utility.

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print