Alderpoint County Water District Water Improvement Project

4 Documents in Project

Summary

SCH Number
2012042029
Lead Agency
Alderpoint County Water District
Document Title
Alderpoint County Water District Water Improvement Project
Document Type
NOD - Notice of Determination
Received
Posted
7/17/2013
Present Land Use
GPD: RCC Z: FR-B-5 (5)

Document Description
The California Department of Public Health (Department) is a responsible agency for this project. The Department's Safe Drinking Water Proposition 50 Program is providing state funds for the project. The Alderpoint County Water Agency proposes to replace existing intake pumps adjacent to the Eel River, remove and replace a treatment building, install a new filtration system and clearwell, and install a new transmission water pipe along existing rights of way and easements to storage site. The existing storage tank will be replaced with two new tanks.

Contact Information
Karen Horn
CA Department of Public Health
1616 Capital Avenue, MS 7408 P.O. Box 997413
Sacramento, CA 95899

Phone : (707) 926-5388

Location

Coordinates
40°10'15"N 123°36'31"W
Counties
Humboldt
Cross Streets
Community-Wide. Alderpoint Road and River Road
Zip
95511
Total Acres
.14
Parcel #
216-261-047, 216-271-018, -019, -021, -022, 216-246-007, -006, 216-452-001
Schools
Jewett School
Waterways
Eel River
Township
3S
Range
5E
Section
27
Base
HB&M
Other Location Info
City/Nearest Community: Alderpoint

Notice of Determination

Approving Agency
CA Department of Public Health
Approving Agency Role
Lead Agency
Approved On
Final Environmental Document Available at
CA Department of Public Health 1616 Capital Avenue, MS 7408, P.O. Box 997413 Sacramento CA 95899-7413

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print