U.S. Army Corps of Engineers, Encinitas and Solana Beach Shoreline Protection Project

7 Documents in Project

Summary

SCH Number
2012041051
Lead Agency
City of Solana Beach
Document Title
U.S. Army Corps of Engineers, Encinitas and Solana Beach Shoreline Protection Project
Document Type
NOD - Notice of Determination
Received
Posted
10/23/2015
Present Land Use
The project is a proposed coastal storm damage reduction project that would be located on the Public Beach.
Document Description
The proposed project consists of reducing potential coastal storm damage by placing material along two discrete beach segments: Segment 1 in the City of Encinitas; and, Segment 2 in the City of Solana Beach. The City of Encinitas certified the EIR and approved Alternative EN-1B for Segment 1 in Encinitas, involving dredging from offshore and placing approximately 340,000cy of material initially and renourishing up to every 5 years. The City of Solana Beach certified the EIR and approved alternative SB-1B for Segment 2 in Solana Beach, involving dredging and placing approximately 700,000 cy of material and renourishing up to every 10 years.

Contact Information

Name
Kathy Weldon
Agency Name
City of Encinitas
Contact Types
Lead/Public Agency

Location

Cities
Encinitas, Solana Beach
Counties
San Diego
Cross Streets
Shorelines and offshore areas comprise the project site.
Zip
92075
Parcel #
Shoreline and offshore
State Highways
Hwy 5 & 101
Railways
NCTD
Airports
No
Schools
several
Waterways
Pacific Ocean, San Dieguito and San Elijo Lagoons

Notice of Determination

Approving Agency
City of Encinitas/City of Solana Beach
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.