Sol Orchard Valley Center Solar Energy Project; 3300 11-027 (MUP)
2 Documents in Project
Summary
SCH Number
2012041028
Lead Agency
San Diego County
Document Title
Sol Orchard Valley Center Solar Energy Project; 3300 11-027 (MUP)
Document Type
NOD - Notice of Determination
Received
Posted
8/20/2012
Present Land Use
Agricultural/Residential/ A70, Limited Agricultural Use Regulations/Semi-Rural Residential 4
Document Description
The applicant requests a Major Use Permit to allow for the construction and operation of a photovoltaic solar farm. The project would consist of solar panels over approximately 46.1 acres of the 54.6 acre site with a production capacity of 7.5 Megawatts (MW). The proposed panels would be single-axis tracking photovoltaic solar panels supported on a galvanized driven H-pile post system which would not exceed 12-feet in height at maximum tilt. The project includes trail dedication and improvements along with landscaping to screen the facility.
Contact Information
Name
Mark Slovick
Agency Name
San Diego County
Contact Types
Lead/Public Agency
Phone
Location
Coordinates
Counties
San Diego
Cross Streets
Vesper Road and Valley Center Road
Zip
92082
Total Acres
54.6
Parcel #
188-290-20-00
Schools
Valley Center/Pauma Unified
Township
11S
Range
1W
Section
8
Base
SBB&M
Other Location Info
City/Nearest Community: Valley Center
Notice of Determination
Approving Agency
County of San Diego Planning Commission
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
N/A
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.