Templeton Community Services District Flow Re-Routing Project

10 Documents in Project

Summary

SCH Number
2012041010
Lead Agency
Templeton Community Services District
Document Title
Templeton Community Services District Flow Re-Routing Project
Document Type
NOD - Notice of Determination
Received
Posted
5/29/2013
Present Land Use
Unincorporated lands are Rural Lands and Agricultural designations
Document Description
The Templeton Community Services District proposes a change (project change) to the proposed pipeline route for its Wastewater Flow Re-routing Project (MND), which was approved by TCSD on May 22, 2012. A Notice of Determination for the Project was filed on May 25, 2012. The proposed pipeline has been changed in two locations as shown below. The route has been shifted for a segment along the railroad tracks to follow Marquita Avenue west to La Cruz Way and south to Cow Meadow Place, turning back east up a driveway to resume the railroad alignment. Along this alignment where existing mature oak trees canopy over the right of way, the pipeline will be bored if necessary to avoid tree roots. The second change shifts a segment between Main Street and US 101 south crossing open fields to a new location where boring under the freeway for the pipeline will occur. The proposed changes are to pipeline alignments and the changes do not alter the characteristics of the remainder of the Project.

Contact Information

Name
Dave Andres
Agency Name
Templeton Community Services D
Contact Types
Lead/Public Agency

Location

Cities
Paso Robles
Counties
San Luis Obispo
Cross Streets
roughly parallel the Salnas River/UPRR
Zip
93449
Parcel #
Public Rights of Way
State Highways
Hwy 101
Railways
UPRR
Waterways
Salinas River
Other Location Info
City/Nearest Community: Templeton

Notice of Determination

Approving Agency
Templeton Community Services District
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print