Templeton Community Services District Flow Re-Routing Project
10 Documents in Project
Summary
SCH Number
2012041010
Lead Agency
Templeton Community Services District
Document Title
Templeton Community Services District Flow Re-Routing Project
Document Type
NOD - Notice of Determination
Received
Posted
8/17/2012
Present Land Use
Unincorporated lands are Rural Lands and Agricultural designations
Document Description
Templeton Community Service District proposes a change in wastewater operations that would re-route the treatment and disposal location of 220,000 gallons per day (gpd) to the Meadowbrook wastewater treatment plant (WWTP) and Selby Percolation Pond Facility (Selby Ponds). This wastewater is currently discharged to the Salinas River after treatment from the City of Paso Robles WWTP. The project would require construction of new conveyance infrastructure (pipelines and pumps) in uplands and existing developed areas. The new pipeline alignment would run along approximately 2.4 miles connecting to existing TCSD facilities and pipelines.
Contact Information
Name
Bettin L. Mayaer
Agency Name
State Water Resources Control Board
Contact Types
Lead/Public Agency
Phone
Location
Cities
Paso Robles
Counties
San Luis Obispo
Cross Streets
roughly parallel the Salnas River/UPRR
Zip
93449
Parcel #
Public Rights of Way
State Highways
Hwy 101
Railways
UPRR
Waterways
Salinas River
Other Location Info
City/Nearest Community: Templeton
Notice of Determination
Approving Agency
State Water Resources Control Board, Divsion of Water Rights
Approving Agency Role
Responsible Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.