Utility Master Plans

2 Documents in Project

Summary

SCH Number
2012032055
Lead Agency
City of Galt
Document Title
Utility Master Plans
Document Type
NOD - Notice of Determination
Received
Posted
5/18/2012
Present Land Use
Various land use and zoning designations throughout the City
Document Description
The City of Galt has prepared a Wastewater Collection System Master Plan, a Water Distribution System Master Plan, and a Storm Drainage System Master Plan, which together make up the City's Utility Master Plans. The Master Plans were prepared and developed consistent with the recently adopted 2030 General Plan. The Master Plans would result in the construction and installation of infrastructure improvements within the Galt city limits to address existing needs as well as areas outside the existing city limits to serve future anticipated development.

Contact Information

Name
Chris Erias
Agency Name
City of Galt
Contact Types
Lead/Public Agency

Location

Cities
Galt
Counties
Sacramento
Zip
95632
Total Acres
8,817(at buildou
State Highways
SR 104, SR 99
Railways
Union Pacific
Schools
Marengo Ranch ES, Robert L. McCaffrey MS,...
Waterways
Deadman Gulch
Township
5N
Range
6E
Section
27
Base
MDB&M
Other Information
Schools Cont.: Estrellita HS, River Oaks ES, Lake Canyon ES, Galt HS, Liberty Ranch HS, Valley Oaks ES, Fairsite ES, Galt Joint Union ES.

Notice of Determination

Approving Agency
City of Galt
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print