320 Church Street, Half Moon Bay, CA 94019

3 Documents in Project

Summary

SCH Number
2012032035
Lead Agency
Half Moon Bay, City of (City of Half Moon Bay)
Document Title
320 Church Street, Half Moon Bay, CA 94019
Document Type
NOD - Notice of Determination
Received
Posted
6/6/2012
Present Land Use
Commercial-General (LCP)/Commercial Downtown (C-D) Zoning District

Document Description
The proposed project consists of a Tentative Subdivision Map, Lot Line Adjustment, Coastal Development Permit, and Use Permit to divide two parcels totaling 5.5 acres (APNs 056-150-010 and 056-150-120) into a small development with 12 residential lots and one commercial lot. The proposed project includes a private road that will extend from Church Street to direct connection to Highway 1. An emergency access gate on the private road will separate the proposed commercial use from local residential traffic. The project also includes various infrastructure improvements and connections including water system improvements to increase capacity and pressure, sewer improvements along Church Street, landscaping, and new fire hydrants.

Contact Information
Tonya Ward
City of Half Moon Bay
501 Main Street
Half Moon Bay, CA 94019

Phone : (650) 726-8250

Location

Coordinates
37°27'58.36"N 122°25'52.66"W
Cities
Half Moon Bay
Counties
San Mateo
Cross Streets
Church Street & Highway 1
Zip
94019
Total Acres
5.5
Parcel #
056-150-010 & 056-150-120
State Highways
Hwy 1, 92
Schools
Yes
Waterways
Pilarcitos Creek and the Pacific Ocean

Notice of Determination

Approving Agency
City of Half Moon Bay
Approving Agency Role
Lead Agency
Approved On
Final Environmental Document Available at
501 Main Street, Half Moon Bay, CA

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print